factory technician level - complete with board views :
( removing chassis from cabinet , only thing missing ) ;
on weekends , staff is not available so - be patient .
Excellent manual. In addition to the information I needed was a complete description of both electronic and mechanical devices.
Excellent site.
Thank you very much.
Text excerpt from page 5 (click to view)
MAIN BOARD, MECHANISM DECK (MT-40-118)
Note: On installation MAIN board adjust the S105 and button (pause).
6 three screws (IB lock) 7 claw
button (pause)
8 mechanism deck (MT-40-118)
1 Remove four solders of motor leads (M901).
S105
5 MAIN board 2 Remove the two solders screw 4 of the head lead (HRP901). (M1.4) 3 screw (1.7)
NOTE FOR INSTALLATION
� MAIN BOARD On installation MAIN board adjust the S101 and REC lever.
screw (1.7) screw (M1.4)