|
Who's Online
There currently are 5976 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
An excellent service manual contains dismantling locations of components, electronic adjustments,worth the money.
;
Caracteristiques,circuit adjusment,notes on schematis diagram,it's a good service manual,to live well,thanks.
;
Service Manual in good quality, with all of the pages.
;
Very usrfull for repaur, great quality copy. includes complete parts list and schematics
;
Good quality Service Manual, availability of components includes disassembly, electronic adjustments. Includes a full list of details and diagrams. Contains 58 pages.
ENGLISH
2. POWER SUPPLY DURING REPAIRS
JAPANESE
In this unit, about 10 seconds after power is supplied to the battery terminal using the regulated power supply (8.4V), the power is shut off so that the unit cannot operate. This following two methods are available to prevent this. Take note of which to use during repairs. Method 1. Use the AC power adaptor. Method 2. Connect the servicing remote commander RM-95 (J-6082-053-B) to the LANC jack, and set the commander switch to the �ADJ� side.
3.
1 2 3 4 5 6 7 8
TO TAKE OUT A CASSETTE WHEN NOT EJECT (FORCE EJECT)
Remove the front panel section. Remove the cabinet (R) section. Remove the cabinet (upper) block assembly. Remove the lens section. Remove the FP-064 flexible board and ST-114 board. Remove the VC-380 board. Remove the MD frame and mechanism deck. Connect the mechanism and the VC-380 board by inserting the three flexible boards from the left except the one going to CN1008 (29P, 0.3mm). 9 Supply +4.5V from the DC power supply to the loading motor and unload with pressing the cassette compartment.
DC power supply (+4.5Vdc)
Loading motor Connect the three flexible board, but not the flexible board going to CN1008.
CN1008
VC-380 board
DCR-HC90/HC90E 1-2
|
|
|
> |
|